I graduated with a Bachelor of Science in Architecture with Honors from Strathclyde University, Glasgow, Scotland 2011. This was my final year project where I proposed a multi-purpose University to merge all design students under one roof at the most inspiring and unique location, which connects the building onto Glasgow Central Train Station with its own platform so visitors and students can come from all over the U.K. to the school. With its unique inverted pyramid public gallery walk through space for multi media, projections, art, sculpture and design to be displayed throughout, a private gallery suspended below just hovering about the River Clyde, and three spacious floors for students. The building has its own sustainable agenda from the construction, to structure and the modular facade. (Click on each image to expand in detail.)
Work I did in my Part I Logbook with S&P Architects, Glasgow, Scotland.
Overton Primary, Greenock